Maintenance

Lift Servicing on 4 August 2026

Engineers from Next Level Lifts Ltd will be on-site from 9am on 4th August 2026 to conduct quarterly servicing and maintenance of the lifts in both Trelawney House and Piran Place. Please be aware that lift operations will be temporarily interrupted at various times throughout the day and we apologise for any inconvenience this may […]

Fire Alarm Inspection on 28-29 May 2026

Engineers from our new fire & electrical contractors Argos Fire Protection will be on-site between 28–29 May to carry out the 6 monthly servicing of our fire alarm systems. Engineers will require access to individual apartments at some point between 9am and 4pm to test the heat detector in each apartment. We fully appreciate that

Lobby door repairs

The first of the lobby door repairs will take place in Trelawney House on Friday 1st May, beginning at 9am. This will create some minor disruption for residents entering and exiting the building, but at no point will the door be blocked as it remains an emergency exit. The rest of the door repairs at

Lift Servicing on 5 May 2026

Engineers from Next Level Lifts Ltd will be on-site from 9am on 5th May 2026 to conduct quarterly servicing and maintenance of the lifts in both Trelawney House and Piran Place. Please be aware that lift operations will be temporarily interrupted at various times throughout the day and we apologise for any inconvenience this may

Lift Inspection (LOLER) on 15-16 April 2026

Inspectors from Allianz Insurance will be on-site from 9am on 15th and 16th April to conduct a 6 monthly inspection of the lifts in both Trelawney House and Piran Place. This is in accordance with Lifting Operations and Lifting Equipment Regulations 1998 (LOLER): https://www.hse.gov.uk/work-equipment-machinery/thorough-examinations-lifting-equipment.htm Please be aware that lift operations will be temporarily interrupted at

Scroll to Top